International Hot Rod Association (IHRA) officials announced last week the cancellation of the IHRA World Nationals event and the Summit Pro-Am Tour scheduled at Dragway 42 due to construction delays. The IHRA Drag Racing Series will host their championship event at US 131 Motorsports in Martin, Michigan August 12 – 13, 2016.
Dragway 42 located in West Salem, Ohio was scheduled to be the last event of the 2016 IHRA Drag Racing Series season on September 23 – 24. Unforeseen construction delays have prevented the management at Dragway 42 to complete the rebuilding of the facility to host the IHRA events. The IHRA will look to host a national event at the quarter-mile dragstrip again in 2017 as well as sportsman events.
The IHRA Drag Racing Series “season ending” racer point fund will remain the same despite the elimination of the season-end World Nationals. In addition, the Summit Pro-Am Tour events scheduled for Dragway 42 will not be rescheduled. To assist Division 3 competitors in fulfilling their “in division” points claims, both events scheduled at Empire Dragway August 19-21 will count as “in division” events for those racers claiming Division 3 points in the Summit Pro-Am Tour.
Photo credit Dragway 42
You might also like
A 1,000-HP Cheat Code: Texas Speed's 7.0L Gen IV LS Short Block
If you don't want to wait for a short block Texas Speed has your answer. TSP's 427 C.I. resleeved short block is a powerhouse.
